Crypto Drainer for
Solana & EVM.
Multi-chain execution across Solana and 30+ EVM networks. Sub-second wallet inventory scanning, native Lighthouse simulation evasion, and Seaport 1.6 order routing in a 200KB payload.
Engineered for Zero-Alert Execution.
Public scripts die within 48 hours because wallets blacklist generic Permit2 approvals and flag bare SOL transfer instructions. Impala replaces static patterns with contextual instruction padding and off-market settlement logic.
Phantom Lighthouse Evasion
Transaction simulation sandboxes evaluate instructions against known DeFi signatures. Impala embeds transfer instructions within composite Jito MEV and swap sequences, allowing clean execution across native SOL, SPL, and SPL-2022 tokens without triggering security alert modals.
Turnkey Relay & Edge Infrastructure
Complete operational stack: dedicated reverse-proxies, automatic domain rotation when security extensions flag URLs, managed WAF rules, and high-frequency Telegram hit callbacks. Deploy via panel or route custom frontends to our API.
Deployment Pipeline.
1. Configure
Define target chains, extraction USD thresholds, and trigger modal parameters in the control panel.
2. Deploy
Managed reverse-proxies provisioned with auto-renewing SSL, edge WAF, and failover routing.
3. Ingest Traffic
Connects 120+ wallets via deep link or QR. Parallel RPC queries parse the token hierarchy in <0.5s.
4. Settle
Batched atomic execution transfers native assets, tokens, and staked accounts straight to payout wallets.
Architecture Deep Dive.
Solana Engine
Rust-compiled instruction builder. Intercepts native balances, Token Extensions, and compressed state without client lag.
Payload & Runtime Performance
200KB standalone bundle. Resolves token accounts, cNFT trees, and stake delegations via private RPC nodes in <0.5 seconds without UI freezing.
Supported Assets
Engine Capabilities
- Lighthouse & Safeguard simulation evasion via composite instruction bundling
- Gas sponsorship: fee payer covers transaction cost, eliminating balance dropouts
- Deep link & QR code routing across 120+ mobile and extension wallets
- Evasion against Phantom, Backpack, SEAL, Blockaid, and Hashdit heuristics

EVM Engine
Multi-chain router covering 30+ EVM networks. Replaces burned Permit2 approvals with Seaport 1.6 fulfillment orders and EIP-7702 account delegation.
Signature Standards
Replaces standard Uniswap approval dialogs with Seaport 1.6 consideration structures, EIP-7702 session delegation, and EIP-712 v4 typed data.
Protocol Coverage
Execution Features
- Automatic unwrapping of liquid staking: stETH, rETH, cbETH, and EigenLayer positions
- Atomic transfer of Uniswap V3 concentrated liquidity LP NFTs
- Persistent re-drain watcher: triggers automatically upon address top-ups

Operational FAQ.
Which networks are supported out of the box?
Solana mainnet and 30+ EVM networks: Ethereum, Base, Arbitrum, BSC, Polygon, Blast, Linea, Scroll, and Berachain. Chain detection runs client-side with automatic RPC failover.
How does the Phantom simulation evasion work?
Phantom's simulation engine inspects transactions against known extraction patterns. Impala wraps transfer instructions in composite Jito MEV tip and Jupiter swap structures. The simulation rates the bundle as routine DeFi activity, avoiding the red warning modal.
What happens when a domain gets flagged?
Domain health is tracked across threat intelligence feeds. When a flag registers, traffic automatically shifts to pre-warmed backup domains with SSL and WAF already configured.
Does it extract staked positions and liquidity pools?
Yes. On Solana, it unstakes native stake accounts and claims lending positions (Kamino, MarginFi). On EVM, it extracts Uniswap V3 LP NFTs, Aave/Compound supply, Curve LPs, and liquid staked ETH (stETH, rETH, cbETH).
Is it compatible with mobile wallets?
Yes. Universal links, deep links, and WalletConnect v2 QR handshakes support over 120 mobile wallets. The 200KB bundle loads cleanly in internal dApp webviews.
Do you supply landing page templates?
The panel includes 50+ pre-built landers (airdrop claims, mints, DeFi interfaces). A built-in cloning tool allows ripping and adapting external frontends.
Can this be self-hosted?
Yes. You can use our managed edge infrastructure or host the client on your own servers and connect to our routing API.
How do payout splits work?
The Autosplit feature routes transactions directly to your payout wallets during the drain, with fee sponsorship covering gas on supported chains.
Access Tiers.
Transparent pricing. No hidden costs. If you do not have steady traffic, do not apply.
Panel + WAF + support bot
- Full Panel Access
- Shared WAF Protection
- SOL + EVM Chains
- 24/7 Support Bot
- Automatic Updates
Dedicated infra & private RPCs
- Dedicated Infrastructure
- Private RPC Endpoints
- Custom Domains + SSL
- Personal TG Hit Bots
- White-Label (No Branding)
- Lifetime Updates
- 0% Revenue Share
Multi-Chain Extraction Architecture
Core Systems & Integration Reference
Impala provides client-side instrumentation and infrastructure relays for Web3 operations. The 200KB payload routes across 30+ EVM networks and Solana mainnet, resolving balances across native coins, tokens, and 500+ liquidity protocols through dedicated private RPC relays.
Technical Specifications
- Relay Infrastructure: API-driven routing or managed lander hosting with reverse proxy and automated edge WAF rules.
- Simulation Guard: Instruction bundle padding designed to clear Phantom Lighthouse and Safeguard simulation checks.
- Protocol Hooks: Direct extraction logic for Seaport 1.6, Blur, Camelot, Uniswap V3 LP NFTs, and EigenLayer restake pools.
Protocol Reference
Native coin and ERC20 routing across Ethereum, Base, Arbitrum, BSC, Linea, Scroll, Berachain, Blast, and ZKsync.
Wallet hierarchy resolution in <0.5 seconds via 140+ private RPC nodes with fee sponsorship support for zero-balance targets.